Plant shutdown

Nexxo · ENAP Quintero.

Backup steam for a scheduled plant shutdown at the ENAP Quintero terminal, executed with Nexxo within a strict window.

P-07 FolioChile · ValparaísoSQ Rental · /016,000 kgv/hr
6,000 kgv/hr boiler · Quintero terminal
FIG. P-07 · 6,000 kgv/hr boiler · Quintero terminalPhotographic site record
01Technical data sheet
Folio P-07

The nameplate data.

FieldRecord
ClientNexxo · ENAP
SiteChile · Valparaíso
Capacity6,000 kgv/hr
DivisionSQ Rental · /01
ScopeBackup during plant shutdown
FuelTo be confirmed
CertificationDS10/2012 filed with SEREMI de Salud
02Development
Challenge · Solution · Result

A maintenance window delivered on schedule.

The challenge

A strict shutdown window

Every shutdown day has a cost: the thermal backup had to be operational exactly when needed.

The solution

Planning with the contractor

Coordination with Nexxo to assemble and test the 6,000 kgv/hr unit before the window opened.

The result

Shutdown on schedule

Maintenance was completed as planned, with backup steam available 100% of the window.

03The window in numbers
Shutdown record

Zero schedule deviations.

6,000 kgv/hr
Backup installed
100%
Window coverage
D-7
Early assembly *
0
Schedule deviations *

* Reference indicators for demo purposes · to be confirmed with SQ Energías.

04Other records
Full record ↗

More sites from the record.

Folio P-07 · Nexxo · ENAP Quintero

A job similar to yours?

Tell us capacity, location and timeframe: the technical proposal arrives within 2 business hours.