The challenge
A strict shutdown window
Every shutdown day has a cost: the thermal backup had to be operational exactly when needed.
Backup steam for a scheduled plant shutdown at the ENAP Quintero terminal, executed with Nexxo within a strict window.

Every shutdown day has a cost: the thermal backup had to be operational exactly when needed.
Coordination with Nexxo to assemble and test the 6,000 kgv/hr unit before the window opened.
Maintenance was completed as planned, with backup steam available 100% of the window.
* Reference indicators for demo purposes · to be confirmed with SQ Energías.