Regional fleet

Nexxa Resources.

High-capacity steam for mining in Peru: an international fleet mobilization that validates SQ Energías’ regional coverage.

P-06 FolioPeruSQ Rental · /0120,000 kgv/hr
Key points on site
K-01

The front line of regional coverage: our own equipment crossing borders to a mining site.

K-02

Customs clearance and technical homologation coordinated by SQ.

K-03

Commissioning with local support and engineering backup from Chile.

20,000 kgv/hr boiler · Peru site
FIG. P-06 · 20,000 kgv/hr boiler · Peru siteSite record
01Technical data sheet
Folio P-06

The nameplate data.

FieldRecord
ClientNexxa Resources
SitePeru
Capacity20,000 kgv/hr
DivisionSQ Rental · /01
ScopeInternational fleet mobilization
FuelTo be confirmed
CertificationLocal regulations · to be confirmed
02Development
Challenge · Solution · Result

The fleet crosses borders.

The challenge

Operating outside Chile

Customs, local regulations and high-altitude logistics: a mobilization that demands engineering and planning.

The solution

Turnkey mobilization

International transport, equipment customs clearance and commissioning with local support coordinated by SQ.

The result

Regional operation validated

The 20,000 kgv/hr unit was left operating on site, consolidating SQ’s presence in Peru.

03The mobilization route
Chile → Peru

Four stages to cross the Andes.

Stage 01

Preparation in Colina

Unit overhaul, testing at base and packing for international transport.

Stage 02

Customs clearance

Documentation, permits and technical homologation to operate under Peruvian regulations.

Stage 03

The Andean route

Special road transport with escort to the mining site.

Stage 04

Start-up on site

Assembly, connections and commissioning with a local crew and SQ backup.

* Reference stages for demo purposes · logistics details to be confirmed with SQ Energías.

04Other records
Full record ↗

More sites from the record.

Folio P-06 · Nexxa Resources

A job similar to yours?

Tell us capacity, location and timeframe: the technical proposal arrives within 2 business hours.