48h protocol

CIAL Alimentos.

Steam for cooking and sterilizing at a high-volume processed meats plant: rapid deployment of an 8,000 kgv/hr unit to secure the production chain.

P-05 FolioChile · Región MetropolitanaSQ Rental · /018,000 kgv/hr
8,000 kgv/hr boiler · CIAL
FIG. P-05 · 8,000 kgv/hr boiler · CIALPhotographic site record
01Technical data sheet
Folio P-05

The nameplate data.

FieldRecord
ClientCIAL Alimentos
SiteChile · Región Metropolitana
Capacity8,000 kgv/hr
DivisionSQ Rental · /01
ScopeEmergency deployment
FuelTo be confirmed
CertificationDS10/2012 filed with SEREMI de Salud
02Development
Challenge · Solution · Result

From the call to steam in 48 hours.

The challenge

An emergency on the clock

A thermal failure at a food plant is measured in hours: product at risk and dispatch commitments.

The solution

Priority 48 h dispatch

An 8,000 kgv/hr unit dispatched, assembled and running under the SQ emergency protocol.

The result

Production chain secured

The plant resumed cooking and sterilizing without inventory loss.

03Emergency protocol
Hours since the call

The 48h protocol clock.

T+0

Emergency call

Requirement comes in through the direct line; the on-duty engineer opens the case.

T+6

Unit assigned and en route

An 8,000 kgv/hr boiler with peripherals leaves the Colina base on special transport.

T+24

Assembly and connections

The SQ crew executes the assembly and the steam and fuel tie-ins at the plant.

T+48

Steam online

Testing and handover to production: cooking and sterilizing back at full rate.

* Reference timeline for demo purposes · exact times to be confirmed with SQ Energías.

04Other records
Full record ↗

More sites from the record.

Folio P-05 · CIAL Alimentos

A job similar to yours?

Tell us capacity, location and timeframe: the technical proposal arrives within 2 business hours.