Continuity in extreme weather
The operation demands thermal continuity through wind, cold and a logistics chain where every day in transit counts.
Backup steam generation for ENAP’s operation in the far south: a 7,000 kgv/hr mobile boiler deployed, assembled and commissioned in one of the continent’s most demanding climates.
One of the southernmost mobilizations in the SQ record: over 3,000 km from the Colina base.
Operating in extreme wind and cold: hot start-up and reinforced line insulation.
Backup steam for refining processes without stopping the complex’s operation.

The operation demands thermal continuity through wind, cold and a logistics chain where every day in transit counts.
A 7,000 kgv/hr boiler was deployed with self-contained peripherals (condensate, pumps, stack and blowdown), ready to connect on arrival at site.
Steam available without stopping the operation, with certified assembly and technical backup throughout the service.
Process sizing and assignment of the 7,000 kgv/hr unit from the Colina base.
Special transport bound for Magallanes: over 3,000 km of route across two countries.
Foundations, lifting and steam, fuel and blowdown connections with our own crew.
Testing, certification and handover to operation with 24/7 technical backup.
* Reference timeline for demo purposes · exact lead times to be confirmed with SQ Energías.
Tell us capacity, location and timeframe: the technical proposal arrives within 2 business hours.
We use essential cookies to run the site and optional ones for analytics and language preference. You can change your choice anytime. See cookie policy