Far-south operation

ENAP Magallanes.

Backup steam generation for ENAP’s operation in the far south: a 7,000 kgv/hr mobile boiler deployed, assembled and commissioned in one of the continent’s most demanding climates.

P-01 FolioChile · MagallanesSQ Rental · /017,000 kgv/hr
Key points on site
K-01

One of the southernmost mobilizations in the SQ record: over 3,000 km from the Colina base.

K-02

Operating in extreme wind and cold: hot start-up and reinforced line insulation.

K-03

Backup steam for refining processes without stopping the complex’s operation.

7,000 kgv/hr boiler · ENAP Magallanes site
FIG. P-01 · 7,000 kgv/hr boiler · ENAP Magallanes siteSite record
01Technical data sheet
Folio P-01

The nameplate data.

FieldRecord
ClientENAP · Empresa Nacional del Petróleo
SiteChile · Magallanes
Capacity7,000 kgv/hr
DivisionSQ Rental · /01
ScopeTransport, assembly and commissioning
FuelTo be confirmed
CertificationDS10/2012 filed with SEREMI de Salud
02Development
Challenge · Solution · Result

Steam at the end of the world.

The challenge

Continuity in extreme weather

The operation demands thermal continuity through wind, cold and a logistics chain where every day in transit counts.

The solution

A mobile unit ready to connect

A 7,000 kgv/hr boiler was deployed with self-contained peripherals (condensate, pumps, stack and blowdown), ready to connect on arrival at site.

The result

Steam without interruptions

Steam available without stopping the operation, with certified assembly and technical backup throughout the service.

03Mobilization log
Colina base → Magallanes

Nine days from order to steam.

Day 0

Requirement order

Process sizing and assignment of the 7,000 kgv/hr unit from the Colina base.

Day 2

Dispatch south

Special transport bound for Magallanes: over 3,000 km of route across two countries.

Day 7

On-site assembly

Foundations, lifting and steam, fuel and blowdown connections with our own crew.

Day 9

Commissioning

Testing, certification and handover to operation with 24/7 technical backup.

* Reference timeline for demo purposes · exact lead times to be confirmed with SQ Energías.

04Other records
Full record ↗

More sites from the record.

Folio P-01 · ENAP Magallanes

A job similar to yours?

Tell us capacity, location and timeframe: the technical proposal arrives within 2 business hours.